The NAORA Process
Six stages. One managed service.
Every NAORA engagement follows the same six-stage process — planned by NAORA, communicated in plain language at each step, and delivered as a structured monitoring record. Your site team stays focused on the build.
Real-time evidence for program-critical decisions.
Live in-situ strength and temperature trends provide additional evidence to support conversations around saw cutting, stressing, formwork removal, loading and sequencing. NAORA provides engineering-reviewed monitoring and clear milestone evidence to support informed construction decisions within the project’s approved QA process.
From installation to final report. One accountable partner.
NAORA manages sensor installation, live monitoring, project communication and engineering-reviewed reporting, so your team always knows where the concrete stands.
A structured Concrete Performance Record, ready for engineering review.
Independent engineering review through BCRC is available where required by the project.
The managed service, in one panel
What your site team never has to do.
Every task below is one we absorb — completely — so your program keeps moving.
Delivery standards
Four standards every NAORA project follows.
One delivery partner
A single team responsible from pre-pour brief through to the final reporting pack.
Plain-language updates
Milestone and exception notifications with defined escalation contacts confirmed before the pour.
Consistent field standards
NAORA personnel on site for every placement. Every sensor photographed and logged.
Records ready for review
The Concrete Performance Record is structured for the client, project team and nominated engineer. Independent engineering review through BCRC is available where required by the project.
Typical project timeline
From engagement to handover.
Before the pour.
Planning and installation are locked in before pour day so nothing is left to chance.
Everything Agreed Before Pour Day
Placement, thresholds and program dates are agreed with your team and aligned to the project specification.
- Pour plan reviewed with your site engineer or foreman
- Sensor placement mapped to your program
- Site access, PPE and inductions confirmed in advance
- Pre-pour brief circulated to your foreman and QA lead
Every Sensor Installed Correctly
We install, verify and test every sensor before concrete is placed. Depth, spacing and orientation are documented for the project record.
- NAORA personnel on site for placement and verification
- Depth, spacing and orientation photographed
- Signal check completed and live monitoring verified before the pour begins
01Pre-PourEverything Agreed Before Pour Day
Placement, thresholds and program dates are agreed with your team and aligned to the project specification.
- Pour plan reviewed with your site engineer or foreman
- Sensor placement mapped to your program
- Site access, PPE and inductions confirmed in advance
- Pre-pour brief circulated to your foreman and QA lead
02DeployEvery Sensor Installed Correctly
We install, verify and test every sensor before concrete is placed. Depth, spacing and orientation are documented for the project record.
- NAORA personnel on site for placement and verification
- Depth, spacing and orientation photographed
- Signal check completed and live monitoring verified before the pour begins
During the cure.
Continuous data collection with proactive updates. Your team stays focused on the build.
Live Project Monitoring
Continuous data collection with trend review at agreed milestones through the curing period.
- Continuous data collection
- Temperature differentials tracked against thresholds
- Trend review at agreed milestones
- After-hours coverage confirmed
- Milestone notifications sent directly to your nominated site team
- Thresholds and notable trends are flagged in plain language to your nominated contacts
- Escalation when thresholds are approached or exceeded
Alerts When They Matter
Threshold exceedances and notable trends are flagged in plain language to your nominated contacts.
- Plain-language notifications with context
- Trend insight to support sequencing decisions
- Observations tied back to your program
03MonitorLive Project Monitoring
Continuous data collection with trend review at agreed milestones through the curing period.
- Continuous data collection
- Temperature differentials tracked against thresholds
- Trend review at agreed milestones
- After-hours coverage confirmed
- Milestone notifications sent directly to your nominated site team
- Thresholds and notable trends are flagged in plain language to your nominated contacts
- Escalation when thresholds are approached or exceeded
04AlertAlerts When They Matter
Threshold exceedances and notable trends are flagged in plain language to your nominated contacts.
- Plain-language notifications with context
- Trend insight to support sequencing decisions
- Observations tied back to your program
After the pour.
Once curing is complete, NAORA prepares the Concrete Performance Record, ready for engineering review.
Everything Your QA Team Needs
Maturity trends, temperature logs, differential summaries, layout photos and installation records — packaged for QA files and engineering review.
- Concrete Performance Record drafted by NAORA
- Independent engineering review through BCRC is available where required by the project
- Every reading traceable to sensor, time and location
- Clear summary of monitoring data and thresholds
- Delivered as PDF, print-ready, or both
One Clean Handover Pack
A single digital pack — the Concrete Performance Record, raw data, photos, layout map and curing summary — ready to drop into project records.
- All raw sensor data alongside the Concrete Performance Record
- Layout maps and site photos indexed by pour and element
- Structured for client, project team and nominated engineer
- Archived on our end for the life of the project
05ReportEverything Your QA Team Needs
Maturity trends, temperature logs, differential summaries, layout photos and installation records — packaged for QA files and engineering review.
- Concrete Performance Record drafted by NAORA
- Independent engineering review through BCRC is available where required by the project
- Every reading traceable to sensor, time and location
- Clear summary of monitoring data and thresholds
- Delivered as PDF, print-ready, or both
06HandoverOne Clean Handover Pack
A single digital pack — the Concrete Performance Record, raw data, photos, layout map and curing summary — ready to drop into project records.
- All raw sensor data alongside the Concrete Performance Record
- Layout maps and site photos indexed by pour and element
- Structured for client, project team and nominated engineer
- Archived on our end for the life of the project
Permanent project record
Every monitored pour. Clearly documented.
Each nominated pour concludes with a permanent, traceable Concrete Performance Record — bringing together sensor placement, installation verification, timestamped strength and temperature data, milestone notifications, site photographs and reporting in one structured project record.
This provides a clear QA trail for the builder, project team and nominated engineer, from pre-pour planning through to final handover.
Ready to prove this on your next concrete pour?
Run one fixed-scope pilot and experience the complete NAORA service, from planning through to final reporting. No change to your existing testing program. Just better visibility and stronger project records.